Clear-Well
Featured
A field study started in 2023 to demonstrate the Clear-Well technology. Two locations were installed using a direct-push rig.
A soil column was contaminated with LNAPL. Multiple cycles of water table levels were conducted, to generate a wide zone where the NAPL was observed.
A soil column was initially contaminated with LNAPL. After an initial survey was conducted, the water level was dropped.
A soil column was surveyed multiple times a week using both white and UV lights (365 nm), after planting a basil plant on top.